From fabrication and assembly to final testing, our production process turns approved crane designs into working lifting equipment.
━ PRODUCTION / FROM DESIGN TO FABRICATION
Approved designs take shape through specialist manufacturing, assembly and quality checks.
Our production network supports hoisting equipment and EOT-crane systems. Each project moves through coordinated fabrication, crane bridge assembly, electrical work and preparation for delivery.
━ MANUFACTURING / THREE PRIORITIES
Three priorities connecting the discipline to the wider Lemmens engineering process.
01 / FABRICATION
Steelwork, bridge components and lifting equipment are produced from the agreed drawings.
02 / QUALITY
Inspection and testing steps provide checkpoints throughout the manufacturing process.
03 / HANDOVER
Completed systems are checked, finished and separated into transport-ready components.
━ ENGINEERING WORKFLOW
From steel fabrication to final checks, every production stage builds towards a complete lifting solution.
01
Girder plates, end carriages and bridge components are fabricated and aligned.
02
Hoist and crane components are fitted to the approved structure.
03
Controls and electrical equipment are installed and checked.
04
Preparation for painting, acceptance testing and transport closes the workshop phase.
━ PRODUCTION / ISO WORKFLOW
Materials are received, identified and checked against purchase orders and packing records. Approved materials are registered and released for production or service.
Incorrect or damaged deliveries are documented and referred to Purchasing or Work Planning for resolution before the affected materials are released.
Product Management coordinates workshop activities according to approved drawings, production schedules and work orders.
Each production phase is monitored through documented quality checks. Technical changes, progress updates and workshop safety requirements are recorded before components are released for assembly.
Dispatch prepares and coordinates the transportation of manufactured, purchased or repaired components to customer locations.
Materials are packed, identified and organized according to the delivery schedule. Transport documentation is prepared for domestic and international shipments, while returned materials are inspected and processed accordingly.
Planning coordinates project activities from confirmed orders through production, installation and final delivery.
Project leaders organize schedules, resources and purchasing requirements in collaboration with Engineering and Production. Progress is monitored, schedules are adjusted when necessary, and completed projects are documented and archived.