Specialist installation teams bring hoisting equipment and EOT-crane systems together at the client site.
━ INSTALLATION / ON SITE
From delivery coordination to final assembly, installation is planned around the working environment.
Our installation teams handle new lifting equipment, existing systems and refurbishment projects. Technical planning, safe working practices, assembly and documented checks shape each handover.
━ INSTALLATION / THREE COMMITMENTS
Three priorities connecting the discipline to the wider Lemmens engineering process.
01 / SITE PLANNING
Review site access, instructions, materials and assembly sequence.
02 / TEAMWORK
Coordinate work on site with the project lead and relevant specialists.
03 / HANDOVER
Complete required checks and hand over available technical documents.
━ INSTALLATION / DELIVERY PATH
Four practical stages bring the installation process from site preparation to handover.
01
Confirm layouts, site requirements, instructions and safety measures.
02
Bring required parts on site and carry out planned erection work.
03
Complete scheduled inspections and commissioning checks.
04
Supply the agreed records and user documentation as applicable.
━ INSTALLATION / ISO WORKFLOW
Erection & After-sales Management coordinates the assembly, installation, certification and after-sales services of crane systems.
Before installation, site dimensions, assembly drawings and project requirements are reviewed. Planning and execution are discussed with the relevant parties. Safety arrangements are documented in the project file, and a Health & Safety Plan is prepared where necessary.
Installation begins when the required components have been delivered and engineers have been assigned. The team receives site instructions and safety guidance before starting work. Any incidents are handled by designated first-aid personnel and documented.
During execution, the project manager monitors progress and resolves technical or operational difficulties. Approved changes are recorded on the working drawings, while materials used and working hours are documented on job cards.
Before final handover, the required inspection and testing procedures are completed. The relevant user manuals, technical documentation and applicable CE documents are prepared for the client.
Product Management coordinates and executes workshop projects according to the established production planning. Available materials, personnel and equipment are organised to complete work orders efficiently.
The department receives project work files from Planning, including detailed drawings and material specifications. Required materials and components are supplied by Supply Management according to project requirements.
After each production phase, quality inspections are performed using the appropriate checklists. Technical difficulties are reviewed with Work Planning, while approved modifications are recorded on the production drawings and processed by the Drawing Office.
Completed components are released for assembly following the required inspections and documentation checks. Planning deviations, operating hours and employee attendance are recorded for project administration and progress monitoring.
In the event of a workplace accident, designated first-aid personnel coordinate the immediate response. Incidents are documented and reported to the Quality Coordinator. The department also ensures proper waste separation and disposal in accordance with applicable regulations.