━   ABOUT US / Engineering

Engineering
starts with understanding.

Representative activity-detail template: Engineering. Other disciplines would reuse this template with their own content.

LCS — 1969 / TODAY

━  ENGINEERING / THE FIRST STEP

From idea to
approved design.

Our engineers transform industrial lifting ideas into working hoisting equipment and EOT-crane systems.

The original Engineering page describes tailored design solutions, calculations, CAD drawings and multidisciplinary coordination. The goal is an end product that matches the operating environment and customer requirements.

━   ENGINEERED FOR YOUR NEEDS

Three principles.
One practical result.

Our engineers combine technical expertise and modern design tools to deliver reliable, efficient and tailor-made lifting solutions.

01 / USABILITY

Maximum usability

Focus on reliable, user-friendly and maintenance-conscious solutions suited to the site.

02 / QUALITY

Quality by design

Technical decisions are documented and coordinated before production begins.

03 / INNOVATION

Modern engineering tools

Design engineers use 3D models and CAD tools to support production and installation.

━   ENGINEERING WORKFLOW

A clear path from
brief
to production.

Technical workflows below summarize the steps described on the original Engineering page.

01

Requirements & site review

Collect order details, load requirements and the initial layout draft.

02

Calculations & design

Prepare strength checks, electrical/mechanical drawings and technical solutions.

03

Approval & preparation

Develop the required detailed drawings and release information for the next project phase.

04

Production coordination

Provide clear design documentation for manufacturing, installation and acceptance.

━    COMMON QUESTIONS

Before the
first drawing.

Input

  • Order details
  • Lay-out draft

Output

  • Approval draft
  • Detailed drafts E + M
  • Release customer

Functionality

The functionality Engineering/Drawing office is responsible for preparing a definite design. A hoist and/or transport system is designed step by step, based on the agreed customer requests and demands. In exceptional cases a tender drawing with a standard calculation will be made during the tender phase in which the most important requests from the client are submitted.

The basic design will be calculated on strength (standard calculation on strength/deflection) and other specific requests regarding reliability, endurance, maintenance friendly and safety in the design. Specific dimensions will be checked in advance by the project Engineer on behalf of Engineering, before Purchasing and/or Production can be commenced. On the strength of this information an approval drawing can be adjusted, after which it will be sent to the client for approval. After written consent by the client and Sales of the approval drawing, and depending on product planning the detailed drawings can be made.

The drawings will, after internal checks by filling in the Form -checklist (drawing office), be released to Work Planning. The same procedure is used for the design of electrical systems.

General and arrangement drawings and composition drawings are signed digitally by the draftsman when they can be released for production. Important intermediate changes will be drafted in a new detailed drawing. These drawings will be marked with a yellow sticker and the changes will be circled with marker pen. The old drawings will then be withdrawn.

All changes in the design, which are carried out by a competent executive after approval, will be drawn out manually and adjusted afterwards by the Drawing office.

In order to safeguard the management of digital data on the main server, tools will be used to make daily back-ups of computer files and to secure against loss or damage. In case of technical or other problems external expert support will be called in.

Procedures

I01 Design release M -(engineering – after order)
I02 Engineering Installation -(engineering – before order)
I03 FEMA Design phase
I04 Detailed drawings M
I05 CE Marking I 05
I06 Design E-Drawings
I07 Implement changes by M/E
I08 Server Back up -(end stage)

Input

  • Order details
  • Delivery details
  • Progress information

Output

  • Work order
  • Order documents
  • Delivery times
  • Proforma invoice

Functionality

As soon as an order has been made and been confirmed, the General Manager will receive all details regarding this order. He decides who will perform as project leader for that project. The project will then go to the indicated project leader. He will study the project and discuss with Sales if there are any obstructions. If the project is clear, it will go to planning and they decide, with regard the post-calculation details, personnel and specifications of the customer as mentioned in the order file, planning and execution of the order. Project details will be entered into the planning module. The project leader, together with planning, will direct the draftsmen to prepare a draft for approval. Also, the project leader will, together with the purchase clerk, decide which are the critical purchase parts of the order, after which Purchasing can be directed for the purchase. After the client’s approval of the draft the drawings with specifications will be sent to Work Planning.

The Planner will subsequently prepare a weekly planning for the function Production Direction, who will be entrusted with the execution and follow-up of the time planning of the various projects in the workshop. In case of delay or speeding up in the process of production the project planning will be adjusted after consultation with the project leader. The project leader will direct the functionality Invoicing to prepare (part) invoices on time.

Pre-fabricated parts will be prepared for transport, after testing and inspection, to the location of assembly. Dispatch will be directed together with the project leader, after which the assembly can be planned. When the work and the test procedures are finished the delivery can be planned by the Project leader.

All project details will be archived and managed after the project is finished.

Procedures

H.01 Project planning
H.02 Weekly planning
H.03 Project process and Shipment
H.04 After sales planning
H.05 Periodic inspection of hoisting devices

Input

  • Order details
  • Specifications
  • Approval drawing
  • Detailed drawing
  • Assembly drawing
  • Service reports
  • Test procedures

Output

  • Part list
  • Cut list
  • Risk Assessment
  • Method of Statement
  • Repair instructions

Functionality

Functionality Work Preparation will decide which are the required materials and parts and the work that needs to be carried out on these, based on the (work) drawings prepared by Engineering & Drawing Office. This is part mechanical and part electrical. In project-based documents is determined which parts are sawn and which are cut and in which way the parts of the specific installation need to be joined. Where applicable the method of work and the required tools will be determined in advance. Work preparations will also take care of recording specifications for external work. For the repair and erection jobs, they will prepare work voucher so work at side goes smoothly.

For large and/or special projects, for which execution is considered complex, based on the information the planning of production and installation can be altered, after which specific measurements can be taken or recorded in documents regarding this subject. If subsequent work instructions should be required for certain projects or labour, Work preparation will take care of this and have them added to the project file.

All important checks and tests will be recorded in the Test plan, using standard FORM’s. If necessary, supplementary measure or test methods will be added, so everything will be according customers request.

Work preparations will direct alterations to the project file true the Engineering & Drawing Office.

Procedures

J.01 Work preparation M
J.02 Work preparation E
J.03 Testing plan J
J.04 Testing procedures