Inspection, load testing and technical documentation support the safe operation and handover of crane and hoisting systems.

LCS — 1969 / TODAY

━   CERTIFICATION / INSPECTION & TESTING

Inspect. Test.
Document.

Safety demands more than equipment performance—it requires clear evidence from inspections and tests.

Inspection and testing are supported by defined procedures and technical documentation. We consider project requirements, inspection results and handover records as part of a coordinated verification process.

 

━   CERTIFICATION / THREE PRINCIPLES

A systematic
approach.
A safer result.

Three priorities connecting the discipline to the wider Lemmens engineering process.

01 / INSPECTION

Defined inspection scope

Review equipment, operating circumstances and applicable inspection requirements.

02 / TESTING

Planned verification

Carry out the agreed checks and testing stages before release.

03 / RECORDS

Traceable documentation

Capture inspection findings, required records and handover information.

━  CERTIFICATION / VERIFICATION PATH

From requirements
to recorded results.

A structured path from initial requirements to recorded inspection and testing outcomes.

01

Define the requirements

Identify relevant inspection needs and supporting project information.

02

Inspect the equipment

Review the assembled or existing lifting system as appropriate.

03

Perform required tests

Carry out agreed tests using approved procedures.

04

Document the result

Prepare inspection reports and required handover records.

━  CERTIFICATION / ISO WORKFLOW

Process, testing
and documentation.

Input

  • Site instructions
  • Assembly drawings
  • Work vouchers
  • Inspection plans and materials list
  • Test requirements

Output

  • Job card
  • Inspection reports
  • Work vouchers
  • Documentation file

Functionality

Site preparation, assembly, inspections and handover are coordinated through an agreed work plan. The process includes safety instructions, work vouchers, inspection procedures and final documentation to support the safe installation and certification of crane systems.

Procedures

O.01 Project planning
O.02 Health & Safety plan
O.03 Assembly
O.04 Test procedures
O.05 Delivery
O.06 External emergencies
O.07 Hoisting/lifting tools inspection & assembly
O.08 Hoisting/lifting tools repairs
O.09 Periodic inspection of hoisting/lifting tools

Input

  • Work orders
  • Production planning
  • Detailed drawings
  • Price lists
  • Cutting lists
  • Installation schedules
  • Load test requirements

Output

  • Work files
  • Progress reports
  • Quality checklists
  • Work-hour records and timesheets

Functionality

Product Management coordinates workshop activities according to production planning, technical drawings and approved work orders. Materials, personnel and equipment are organized to ensure efficient manufacturing and assembly.

Each production phase is monitored through quality checks, documented inspections and progress reports. Technical changes, safety requirements and workshop activities are recorded to maintain traceability and support the final release of components for installation.

Procedures

M.01 Production Management – Mechanical/Electrical
M.02 Intermediate quality checks
M.03 Workshop release
M.04 Internal emergencies
M.05 Waste management
M.06 Workshop repairs