━   ABOUT US / Production

Built in the workshop.
Ready for the real world.

From fabrication and assembly to final testing, our production process turns approved crane designs into working lifting equipment.

LCS — 1969 / TODAY

━  PRODUCTION / FROM DESIGN TO FABRICATION

From drawings to
working cranes.

Approved designs take shape through specialist manufacturing, assembly and quality checks.

Our production network supports hoisting equipment and EOT-crane systems. Each project moves through coordinated fabrication, crane bridge assembly, electrical work and preparation for delivery.

━  MANUFACTURING / THREE PRIORITIES

 

Made with purpose.
Built to perform.

Three priorities connecting the discipline to the wider Lemmens engineering process.

01 / FABRICATION

Purpose-built assemblies

Steelwork, bridge components and lifting equipment are produced from the agreed drawings.

02 / QUALITY

Documented quality checks

Inspection and testing steps provide checkpoints throughout the manufacturing process.

03 / HANDOVER

Prepared for delivery

Completed systems are checked, finished and separated into transport-ready components.

━   ENGINEERING WORKFLOW

A clear sequence from
fabrication to dispatch.

From steel fabrication to final checks, every production stage builds towards a complete lifting solution.

 

01

Build the structure

Girder plates, end carriages and bridge components are fabricated and aligned.

02

Assemble mechanical systems

Hoist and crane components are fitted to the approved structure.

03

Integrate electrical systems

Controls and electrical equipment are installed and checked.

04

Finish and inspect

Preparation for painting, acceptance testing and transport closes the workshop phase.

━   PRODUCTION / ISO WORKFLOW

Connected
departments.
One production flow.

Input

  • Purchase requisition
  • Packing list / freight bills

Output

  • Order request
  • Approved packing list
  • Material release
  • Delivery discrepancy record

Functionality

Materials are received, identified and checked against purchase orders and packing records. Approved materials are registered and released for production or service.

Incorrect or damaged deliveries are documented and referred to Purchasing or Work Planning for resolution before the affected materials are released.

Procedures

L.01 Stock management
L.02 Receipt of materials
L.03 Customer-supplied materials

Input

  • Work order
  • Production planning
  • Detailed drawings
  • Price list
  • Cutting list
  • Installation schedule
  • Load test requirements

Output

  • Work file
  • Progress report
  • Quality checklists
  • Work-hour records and timesheets

Functionality

Product Management coordinates workshop activities according to approved drawings, production schedules and work orders.

Each production phase is monitored through documented quality checks. Technical changes, progress updates and workshop safety requirements are recorded before components are released for assembly.

Procedures

M.01 Production Management – Mechanical/Electrical
M.02 Intermediate quality checks
M.03 Workshop release
M.04 Internal emergencies
M.05 Waste management
M.06 Workshop repairs

Input

  • Delivery order
  • Material identification

Output

  • Delivery note
  • Freight bill
  • Dispatch documents

Functionality

Dispatch prepares and coordinates the transportation of manufactured, purchased or repaired components to customer locations.

Materials are packed, identified and organized according to the delivery schedule. Transport documentation is prepared for domestic and international shipments, while returned materials are inspected and processed accordingly.

Procedures

N.01 Transport preparation
N.02 Returned materials
N.03 Dispatch documentation

Input

  • Order details
  • Delivery details
  • Progress information

Output

  • Work order
  • Order documents
  • Delivery times
  • Proforma invoice

Functionality

Planning coordinates project activities from confirmed orders through production, installation and final delivery.

Project leaders organize schedules, resources and purchasing requirements in collaboration with Engineering and Production. Progress is monitored, schedules are adjusted when necessary, and completed projects are documented and archived.

Procedures

H.01 Project planning
H.02 Weekly planning
H.03 Project process and shipment
H.04 After-sales planning
H.05 Periodic inspection of hoisting devices